四虎免费最新在线永久4hu_国产成人无码av在线播放dvd_亚洲欧美另类久久久精品_国产a网_精品少妇av一区二区三区_国产精品伦一区_亚洲第一a在线观看网站_男女视频国产_国产色婷婷_亚洲综合影院

中文
Projects
Guangdong Zhongshan-Kaiping Expressway

Zhongkai Expressway is the “seventh horizontal”in the “twelve vertical, eight horizontal, sixteen radial and two rings” of the expressway network planning of Guangdong Province. The “Zhongshan Section” opened for operation this time is connected with Shenzhen-Zhongshan Link in the east and the “Jiangmen Section” in the west, which was put into operation in January 2023, forming an important east-west traffic passage between Guangdong Province and Guangdong-Hong Kong-Macao Greater Bay Area and becoming the traffic corridor and economic corridor of Guangdong-Hong Kong-Macao Greater Bay Area.  

The total length of Zhongkai Expressway is 129.7km (Zhongshan section is 44.1km long and Jiangmen section is 85.6km long), with a total investment of 45.2 billion yuan. It has the characteristics of large investment volume, complex construction conditions and high ratio of bridge and tunnel (up to 94% in Zhongshan section).


Back

Innovation Points

1. Zhongshan City Section: Design of compound three-dimensional passage of expressway and urban expressway.

2. Torch West Hub: Super-large interchange group intercommunicated with entrance and exit and designed in combination with expressway hub.

3. Structural design of double-layer bridge with various structural forms (Qijiang River Bridge is simply supported double-layer steel truss arch bridge with maximum span and maximum width; The maximum cantilever length of central pier cap beam is 18.1m, leading in China).

4. Torch Service Area: The only selected first batch of zero-carbon pilot projects of the Ministry of Transport of Guangdong province.

5. Landscape Road Tunnel: Eight-lane long-span open-cut tunnel under complex geological and environmental conditions (the excavation width of foundation pit is 45m, the depth is 23m, and the distance from roadside buildings is only 0.8m).

6. Dachangshan Tunnel: The first four-lane super-large cross-section mountain tunnel expanded from single-tube three-lane in-situ under construction in China

7. Cross Guangzhou-Zhuhai Intercity Railway: The heaviest single-span high-speed railway swivel bridge in Guangdong province.

8. Comprehensive environmental protection greening design (fully enclosed sound barrier, noise reduction type bridge expansion joint).

9. Application of UHPC high-strength concrete, GFRP glass fiber reinforcement, polyamide drainage grid, environmental isolation rubber bearing and other new materials and new products.

 

Achievements

The cable-stayed bridge with main span of 530m with the first new structure system of hybrid PK box girder cable-stayed bridge, won the first prize of Science and Technology Progress Award of Guangdong Construction Industry Association.


主站蜘蛛池模板: 乌鲁木齐县| 京山县| 新乐市| 灵川县| 图木舒克市| 汕头市| 贵州省| 育儿| 浦城县| 郯城县| 克山县| 泰州市| 武宁县| 宁河县| 宜黄县| 东安县| 武穴市| 辉南县| 莱西市| 苏尼特右旗| 文昌市| 大余县| 和平县| 诏安县| 卢湾区| 赤峰市| 五常市| 宝山区| 浪卡子县| 武山县| 岑溪市| 大安市| 邵阳县| 射阳县| 桃园县| 黄骅市| 毕节市| 海宁市| 赣州市| 红桥区| 淅川县|